Solar power plant 300kW

Plant for the processing of cocoa mass and cocoa butter

Off-grid photovoltaic power plant with a capacity of 300kW at the location of Central Africa (Ivory Coast) covering a constant consumption of 150kW, taking into account the conditions, high insolation and the need for energy storage (batteries) for night consumption or cloudy days.

BASIC ELEMENTS OF THE SYSTEM

1. Solar panels

System power: 300 kW (peak power)

Recommended panels: Monocrystalline, 500–550 W per panel

Number of panels: about 545–600 pieces (depending on the model)

Surface per panel: ~2 m²

Total required area: 1,200 – 1,500 m²

2. LiFePO4 battery system

Objective: Provide energy for 24 hours of autonomy

Daily energy consumption: about 1,800 kWh (depending on the simultaneity coefficient)

Battery capacity: recommended min. 2,000 kWh to 2,200 kWh

Voltages: 384 V or 512 V system, modular design

Type: Lithium iron phosphate (LiFePO₄) – for long life and safety

3. Inverters

Total inverter power: min. 300 kW (divided into 3 units of 100 kW)

Type: Three-phase, off-grid, hybrid